Wapomeo Flushies

This is another one of my projects at Taylor Statten Camps on Canoe Lake in Algonquin Park, Ontario. After the completion of the new shower house at the boy’s camp (see Ahmek King Kybo), it was felt that a renovation of the Wapomeo Flushies shower house at the girl’s camp was long overdue.  The existing building was completely gutted and new plumbing, fixtures, toilet and shower partitions and finishes were installed.

Click on the “Before”, “After” and “Construction” photos below for more photographs of the project.

Before:

IMG_1668

After:

Construction:

Client:  Taylor Statten Camps
General Contractor:  Monteith Building Group Ltd.
Completed: 2008
Gross Floor Area:  745 SF (69.2 SM)